Navigation failed to load. If you are on the UNDRR office network, your browser may be blocking access to external resources. Learn how to allow access.
This Rapid Damage and Needs Assessment (RDNA) estimates the impact on the population, physical assets, infrastructure and service delivery, following the explosions in the Port of Beirut in August 2020.
World Bank, the
Global Facility for Disaster Reduction and Recovery, the (GFDRR)
The framework for Reform, Recovery and Reconstruction (the 3RF) is a people-centered recovery and reconstruction framework, and a part of a comprehensive response to the massive explosion on the Port of Beirut on August 4, 2020.
World Bank, the
United Nations Development Programme (UNDP)
Global Facility for Disaster Reduction and Recovery, the (GFDRR)
This assessment with various post-earthquake recovery stakeholders was carried out to understand the impact of the COVID-19 on recovery and reconstruction in the 32 earthquake affected districts.
The UNCT in Angola prepared this UN Socio-Economic Response Plan to COVID-19, which addresses both programmatic and policy support national needs, to which a budget is attached with costs and financial gaps.
The main aim of the study is to understand resilience and coping of children who are affected by the flood. It is a quantitative and descriptive study by taking 60 samples (30 girls and 30 boys).
This research assesses reconstruction impacts in socio-economic aspects of rural housing with sustainable design parameters to Owner driven approach housing reconstruction after huge Mw 7.8 earthquake of Nepal in 2015.