Skip to main content
PreventionWeb
Navigation loading…

Hybrid structure manual for houses that have been built under the housing reconstruction programme

Source
Nepal - government

This guide outlines the minimum requirements (MRs) for housing reconstruction from the Nepalese National Reconstruction Authority.

The MRs clearly state that for buildings with stone/brick masonry in mud mortar, the number of stories is restricted to only one story if wooden band is used, whereas if a reinforced concrete (RC) band is used, the allowable number of stories is one story plus attic, based on structural analysis.

Hybrid structures are in demand in the reconstruction field. A hybrid structure (mix structure) is the combination of two or more types of structural system that is generally constructed with different techniques and materials in accordance with level of the floor. 

Download

Access View document English

Last checked: 23 December 2019

Editors' recommendations

  • Urban housing reconstruction status paper - the Gorkha earthquake, Nepal, 2015
  • More about the 2015 Nepal earthquake
  • Rebuilding a more resilient Nepal: key recommendations for reconstruction and recovery
  • Nepal earthquake 2015: Post disaster recovery framework
  • Hollow concrete blocks: production and use in earthquake affected districts
  • Link to HRRP Bulletins
  • Link to Common Feedback Project Reports
  • Link to HRRP District Reports

Explore further

Hazards Earthquake
Themes Recovery Shelter and housing Structural safety
Country and region Nepal
Number of pages
102 p.
Publication year
2017

Also featured on

PreventionWeb

Is this page useful?

Yes No
Report an issue on this page

Thank you. If you have 2 minutes, we would benefit from additional feedback (link opens in a new window).

The International Recovery Platform (IRP) is a global partnership working to strengthen knowledge, and share experiences and lessons on building back better in recovery, rehabilitation, and reconstruction.

Latest IRP videos and photos: YouTube Flickr Contact IRP

Loading